This site is not affiliated with AGCO Inc., Duluth GA., Allis-Chalmers Co., Milwaukee, WI., or any surviving or related corporate entity. All trademarks remain the property of their respective owners. All information presented herein should be considered the result of an un-moderated public forum with no responsibility for its accuracy or usability assumed by the users and sponsors of this site or any corporate entity.
The Forum Parts and Services Unofficial Allis Store Tractor Shows Serial Numbers History
Forum Home Forum Home > Allis Chalmers > Farm Equipment
  New Posts New Posts
  FAQ FAQ  Forum Search   Events   Register Register  Login Login


Missouri swap meet

 Post Reply Post Reply
Author
Message
Darrell G (MN) View Drop Down
Orange Level
Orange Level
Avatar

Joined: 11 Sep 2009
Location: Green Isle MN
Points: 1496
Post Options Post Options   Thanks (0) Thanks(0)   Quote Darrell G (MN) Quote  Post ReplyReply Direct Link To This Post Topic: Missouri swap meet
    Posted: 04 Mar 2020 at 5:28pm
I was just informed that the I-35 exit for Larhrop MO will be closed for construction this weekend.  An alternative would be the next exit south the Holt/Lawson exit and then west to 33 Highway and then north to the show grounds.
Back to Top
Sponsored Links


Back to Top
bauerd44 View Drop Down
Silver Level Access
Silver Level Access
Avatar

Joined: 11 Sep 2009
Location: Wentzville, MO
Points: 350
Post Options Post Options   Thanks (0) Thanks(0)   Quote bauerd44 Quote  Post ReplyReply Direct Link To This Post Posted: 04 Mar 2020 at 8:06pm
Just got this off of our MoDOT website.

Interstate 35 ramp closures planned for this weekend

LATHROP, Mo. – In preparation for resurfacing on Interstate 35, crews from Ideker, Inc., working with the Missouri Department of Transportation, plan to close the on and off ramps at Route 116 (Exit 40) on Saturday, March 7 for pavement patching. Crews anticipate that each ramp could be closed approximately 2-3 hours, with work beginning at 7 a.m. As many as two ramps may be closed at the same time.

This pavement repair is one step to prepare for a resurfacing project on I-35 that will extend from the Clay County line to just north of Route 116. During the resurfacing, multiple crews may be working in both directions of I-35 with intermittent single-lane closures. Most work will take place during the day, but some night work may be involved as the project progresses.

Drivers are urged to stay alert and pay attention to all roadway signing and barricades.

All work is weather-permitting and schedules are subject to change. Please remember that all work zones are No Phone zones. Buckle up. Phone down. Arrive Alive. Motorists are reminded to slow down and pay attention while driving in work zones and through the heavy congestion on the detour routes.

For more information about these and other MoDOT projects, sign up online for work zone updates, visit modot.org and view the online Traveler Information Map, or call 888-ASK-MODOT (275-6636) In addition, MoDOT provides updated information on Twitter @MoDOTNorthwest and Facebook at www.facebook.com/MoDOTNWDistrict.

Missouri Allis-Chalmers Club
CA Allis, 175 Allis, 185 Allis
Back to Top
IBWD MIke View Drop Down
Orange Level
Orange Level
Avatar

Joined: 08 Apr 2012
Location: Newton Ia.
Points: 3445
Post Options Post Options   Thanks (0) Thanks(0)   Quote IBWD MIke Quote  Post ReplyReply Direct Link To This Post Posted: 05 Mar 2020 at 8:29am
Thanks for the heads-up!
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.10
Copyright ©2001-2017 Web Wiz Ltd.

This page was generated in 0.063 seconds.


Help Support the
Unofficial Allis Forum