![]()  | 
  This site is not affiliated with AGCO Inc., Duluth GA., Allis-Chalmers Co., Milwaukee, WI., or any surviving or related corporate entity. All trademarks remain the property of their respective owners. All information presented herein should be considered the result of an un-moderated public forum with no responsibility for its accuracy or usability assumed by the users and sponsors of this site or any corporate entity. | |||||
| The Forum | Parts and Services | Unofficial Allis Store | Tractor Shows | Serial Numbers | History | |
New Building part 2 done | 
 
    Post Reply  
   | 
  
| Author | |
   
   rrhead(SD)  
   
   Silver Level  
    
   Joined: 11 Sep 2009 Location: Canton, SD Points: 432  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Topic: New Building part 2 donePosted: 28 Dec 2011 at 4:54pm  | 
 
| 
   
    
   They came and put the wood and the rafters up Tuesday and Wednesday. Took 4 of them 1 1/2 days to complete. Next will be the tin on Friday. Going to be nice when all done. Made it to 50 today. rrhead(SD) 
   
   | 
 |
![]()  | 
 |
| Sponsored Links | |
![]()  | 
 |
   
   1953CA  
   
   Orange Level  
    
   Joined: 01 Jan 2011 Location: Burlington, WA Points: 505  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 28 Dec 2011 at 5:34pm | 
 
| 
   
    
   What size is the building, and how much does that size cost, if you dont mind telling?  Im looking at building one.
    
   
   | 
 |
| 
   
     
     1945 AllisCletrac / 1948 "B" / 1953 "CA" / 1955 "WD-45" / 1963 "D-15 Series II"            
   
  "No Air Support without Ground Support"  | 
 |
![]()  | 
 |
   
   D-allis Iowa  
   
   Orange Level  
   Joined: 05 Oct 2009 Location: Akron, Iowa Points: 494  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 28 Dec 2011 at 5:38pm | 
 
| 
   
    
   looks like it will be a nice strong building and going up quick.
    
   
   | 
 |
![]()  | 
 |
   
   Chris/CT  
   
   Orange Level  
   Joined: 11 Sep 2009 Location: Niantic, Ct Points: 1939  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 28 Dec 2011 at 5:44pm | 
 
| 
   
    
   Those direct burial post, what treatment are they? I'm assuming SYP PT lumber, just curious as to the rating, .60?? Around these parts, bugs are eating .40 PT lumber pretty quickly, can't even use it for direct burial anymore I think.
    
   
   | 
 |
![]()  | 
 |
   
   norm[ind]  
   
   Orange Level  
   Joined: 29 Oct 2010 Location: bourbon,ind Points: 2992  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 28 Dec 2011 at 7:23pm | 
 
| 
   
    
     i have yet  too see anyone building a building  to use the metal strapping to keep the building square????????????  at least on each corner  my  building has 11 cross braces on a 90ft  to help hold it square from wind  too cheap to not install  it cost wise  just a dumb farmer engineering this one???????????  i have a corn crib my dad and myself put up 60yrs ago  and another a carpentr put up with the same bill of lumber we used for ours  is still standing and use it for machinery storage   the other one the carpenter put has been down for 25 yrs 
    
   
   | 
 |
![]()  | 
 |
   
   Ryan Renko  
   
   Orange Level  
   Joined: 12 Sep 2009 Location: Edwardsville, I Points: 2337  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 28 Dec 2011 at 7:33pm | 
 
| 
   
    
   I'm just gunna say its nice to get a good shed to store a mans orange toys!! Great work. Ryan
    
   
   | 
 |
![]()  | 
 |
   
   redline  
   
   Orange Level  
   Joined: 11 Sep 2009 Location: Collins, IA Points: 1013  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 28 Dec 2011 at 8:44pm | 
 
| 
   
    
   
That is looking good! I am amazed how quickly the crew is building that building! Mine seemed to take all summer, and you are getting almost as nice of weather. You won't regret that purchase, I'll bet!
 
   
  Edited by redline - 28 Dec 2011 at 8:46pm  | 
 |
| 
   
     
     If it weren't for the last minute, I wouldn't get anything done!
     
   
   | 
 |
![]()  | 
 |
   
   SHAMELESS  
   
   Orange Level  
   Joined: 13 Sep 2009 Location: EAST NE Points: 29486  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 29 Dec 2011 at 12:46am | 
 
| 
   
    
   it'll be nice when your outta them SD winter winds!
    
   
   | 
 |
![]()  | 
 |
   
   ky wonder  
   
   Orange Level  
   Joined: 13 Apr 2011 Location: horse cave, ky Points: 647  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 29 Dec 2011 at 5:58am | 
 
| 
   
    
   good looking building, i would have thought that the snow in your area would have required the trusses to be set closer than that, i put up a 24x40x12 here in jan 2008, and i used 6" post with 5' trust spacings, and my material package cost me $3500, the crew i had put my small barn up in 2 days and that cost me another $1500 
 
   
  ![]() Edited by ky wonder - 29 Dec 2011 at 6:09am  | 
 |
| 
   
     
     i like old tractors of all colors
     
   
   | 
 |
![]()  | 
 |
   
   Chris/CT  
   
   Orange Level  
   Joined: 11 Sep 2009 Location: Niantic, Ct Points: 1939  | 
  
   
      Post Options
    
        Thanks(0)
      Quote   Reply
   
     Posted: 29 Dec 2011 at 6:04am | 
 
| 
   
    
   Trusses look very stout, what dimension are the top cords? look like 8-10". 
    
   
   | 
 |
![]()  | 
 |
    Post Reply  
   | 
  |
|       
  
  Tweet   	
    | 
 
| Forum Jump | Forum Permissions  ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum  |