This site is not affiliated with AGCO Inc., Duluth GA., Allis-Chalmers Co., Milwaukee, WI., or any surviving or related corporate entity. All trademarks remain the property of their respective owners. All information presented herein should be considered the result of an un-moderated public forum with no responsibility for its accuracy or usability assumed by the users and sponsors of this site or any corporate entity.
The Forum Parts and Services Unofficial Allis Store Tractor Shows Serial Numbers History
Forum Home Forum Home > Other Topics > Shops, Barns, Varmints, and Trucks
  New Posts New Posts
  FAQ FAQ  Forum Search   Events   Register Register  Login Login


Leaking Metal Roof

 Post Reply Post Reply
Author
Message
Coke-in-MN View Drop Down
Orange Level Access
Orange Level Access
Avatar

Joined: 12 Sep 2009
Location: Afton MN
Points: 41914
Post Options Post Options   Thanks (0) Thanks(0)   Quote Coke-in-MN Quote  Post ReplyReply Direct Link To This Post Topic: Leaking Metal Roof
    Posted: 11 hours 36 minutes ago at 3:02pm
After hail last year got the house roof replaces but no back and forth with contractor as 3 sky-lites ( lite tubes ) were also damaged which now are not made anymore .
 So Insurance turned down pole shed roofs as they say hair is cosmetic and they do not cover that or wear and tear to metal roofs . 
 Hail strikes are over 10 in a measured area of sq ft .  What happened is rebound from hail strike caused nail fasteners to pull out of purlins so have many areas where lead washer galvanized ring nails are 1/2 to 3/4 inches above sheeting.
 Now to figure what is next to try to do . Fight insurance or find another solution . 
Asked insurance adjuster about water damage to interior , was told I should do something to stop it from occurring - it's my responsibility  to secure roof .  
Faith isn't a jump in the dark. It is a walk in the light. Faith is not guessing; it is knowing something.
"Challenges are what make life interesting; overcoming them is what makes life meaningful."
Back to Top
Sponsored Links


Back to Top
steve(ill) View Drop Down
Orange Level Access
Orange Level Access
Avatar

Joined: 11 Sep 2009
Location: illinois
Points: 86148
Post Options Post Options   Thanks (0) Thanks(0)   Quote steve(ill) Quote  Post ReplyReply Direct Link To This Post Posted: 10 hours 28 minutes ago at 4:10pm
Nails always PULL.. Should never be used.. Pull them out one at a time and install SCREWS with the rubber washer.. If you dont mind the hail dimples... No need to change the tin..
Like them all, but love the "B"s.
Back to Top
DanWi View Drop Down
Orange Level Access
Orange Level Access
Avatar

Joined: 18 Sep 2009
Location: wttn
Points: 1903
Post Options Post Options   Thanks (0) Thanks(0)   Quote DanWi Quote  Post ReplyReply Direct Link To This Post Posted: 8 hours 35 minutes ago at 6:03pm
Had the son in law walk the roof of our 30 year old 60x100 pole shed 2 years ago after noticing some loose nails. He replaced about 50 that day. On older sheds a guy should check that every so many years as maintenance.
Back to Top
DMiller View Drop Down
Orange Level Access
Orange Level Access


Joined: 14 Sep 2009
Location: Hermann, Mo
Points: 33302
Post Options Post Options   Thanks (0) Thanks(0)   Quote DMiller Quote  Post ReplyReply Direct Link To This Post Posted: 8 hours 14 minutes ago at 6:24pm
Have to watch screws as well, were our roof transitions the Valley pan will deflect from heat and cool, actually Unscrewed several, had to get on the roof and reset.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.10
Copyright ©2001-2017 Web Wiz Ltd.

This page was generated in 0.063 seconds.


Help Support the
Unofficial Allis Forum